Transportation Research Board

Transportation Research Board of the National Academies of Science

Level of service projections for 2006-2007

|
Level of service projections for 2006-2007

 This is from the 2002 Trammel Crow EIR, an estimate based on 315 houses and condos in the Quarry. The Peebles ballot measure is for 355 houses.

Level of service 1986

|
Level of service 1986

The box above contains the existing measured levels of service measured by traffic engineers in 1986.

Definitions of signalized intersection levels of service

|
Definitions of signalized intersection levels of service

The definitions above indicate the level of service (LOS) at the intersections studied by the engineers surveying various traffic/circulatiion scenarios during given time frames and contexts.

Highway 1 Traffic Gets an "F"

| |

General Plan and LCP of Quarry: The1986 General Plan and Local Coastal Plan of the QuarryGeneral Plan and LCP of Quarry: The 1986 General Plan and Local Coastal Plan of the Quarry

2002 "Pacifica Village Center" Final Environmental Impact Report

| | | | | | | | | | | | |

For historical reference, attached is the June 2002 FINAL Environmental Impact Report for the Trammel Crow "Pacifica Village Center" project in the Quarry. The draft version is also availble and has more background information.

Syndicate content